Sign In:


  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel | of | Share this photo

    Volunteer Audrey Kolloff, at left, surveys the shoreline Tuesday at Peninsula Park in Belgrade. The area is near the dam where Great Pond empties into Long Pond.

    Show
  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel | of | Share this photo

    Volunteer Audrey Kolloff surveys the shoreline Tuesday while looking for erosion issues during the Long Pond Watershed survey in Belgrade. The area shown is near the dam where Great Pond empties into Long Pond.

    Show
  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel | of | Share this photo

    Coordinator Jen Jespersen, center, gives instructions to volunteers who met Tuesday at the Belgrade Town Office to begin work on the Long Pond Watershed survey.

    Show
  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel | of | Share this photo

    Volunteers Audrey Kolloff, right, and Wendy Garland survey the shoreline of Long Pond at Peninsula Park in Belgrade on Tuesday. The area shown is near the dam where Great Pond empties into Long Pond.

    Show
  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel | of | Share this photo

    Wendy Garland, a volunteer with the Long Pond Watershed survey, records data on an electronic notebook Tuesday while surveying the shoreline of Long Pond in Belgrade.

    Show
  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel | of | Share this photo

    Volunteer Wendy Garland, right, talks about the benefits of water infiltration steps, shown at the bottom, and a rain garden, shown behind her at the right, to mitigate soil erosion. Garland and Audrey Kolloff surveyed the shoreline of Long Pond, shown in the background, Tuesday in Belgrade. The area shown is near the dam where Great Pond empties into Long Pond.

    Show
  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel | of | Share this photo

    Audrey Kolloff, a volunteer with the Long Pond Watershed survey, observes a snapping turtle while documenting locations Tuesday along Long Pond, near LakeSide Scoops and other Belgrade Village stores, in Belgrade.

    Show
  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel | of | Share this photo

    Wendy Garland and Audrey Kolloff, both volunteers with the Long Pond Watershed survey, left, walk the shoreline Tuesday near LakeSide Scoops and other Belgrade Village stores.

    Show
  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel | of | Share this photo

    Volunteer Audrey Kolloff, right, talks Tuesday about factors that contribute to soil erosion as she and Wendy Garland, also a volunteer, left, survey the shoreline of Long Pond in Belgrade. The area shown is near the dam where Great Pond empties into Long Pond.

    Show
  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel | of | Share this photo

    Water infiltration steps, center, and mature landscaping help control soil erosion at a residence along the Long Pond shoreline in Belgrade. The area shown Tuesday is near the dam where Great Pond empties into Long Pond.

    Show
  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel) | of | Share this photo

    Long Pond Watershed survey volunteers Barbara Barrett, center, and Pam Mackill review survey material Tuesday as they meet with other volunteers at the Belgrade Town Office to begin work on the Long Pond Watershed survey.

    Show
  • Hide
    Long Pond gallery - Rich Abrahamson/Morning Sentinel | of | Share this photo

    Audrey Kolloff, a volunteer with the Long Pond Watershed survey, holds a flip book with letters and numbers for documenting locations Tuesday during the survey along Long Pond, near LakeSide Scoops and other Belgrade Village stores.

    Show