The town’s Memorial Hall Committee hired a Portland architectural firm to go over the building to determine what would be needed to preserve it, how much it would cost and how long the work would take, with a report expected in about a month.
The town’s Memorial Hall Committee hired a Portland architectural firm to go over the building to determine what would be needed to preserve it, how much it would cost and how long the work would take, with a report expected in about a month.