PORTSMOUTH, N.H. — Some repair work is getting under way at the Sarah Mildred Long Bridge connecting New Hampshire to Maine.
Crews are installing supports under steel floor beams on piers of the New Hampshire approach spans. Transportation officials say the work is needed to retain the current 20-ton load restriction on the bridge.
All work is being done during daytime hours and is expected to take six to eight weeks to complete.
Daytime lane closures with alternating one-way traffic on the bridge will be necessary periodically in order to complete the work.
The bridge carries the U.S. Route 1 Bypass over the Piscataqua River between Portsmouth and Kittery, Maine.
The replacement of the bridge is currently scheduled to begin in 2015. It is the No. 1 red-listed bridge in New Hampshire.
Send questions/comments to the editors.
-
Track & Field
Track and field: Lisbon/Oak Hill boys and girls sweep MVC titles
-
Nation & World
Collins exploring bipartisan compromise on gun safety measures
-
Local & State
State seeks dismissal of ACLU lawsuit alleging broad failure to adequately represent poor criminal defendants
-
Boston Celtics
Celtics head home looking to close out top-seeded Heat
-
Varsity Maine
Richmond baseball coach Ryan Gardner reaches 300 career wins
Success. Please wait for the page to reload. If the page does not reload within 5 seconds, please refresh the page.
Enter your email and password to access comments.
Hi, to comment on stories you must . This profile is in addition to your subscription and website login.
Already have one? .
Invalid username/password.
Please check your email to confirm and complete your registration.
Only subscribers are eligible to post comments. Please subscribe or login to participate in the conversation. Here’s why.
Use the form below to reset your password. When you've submitted your account email, we will send an email with a reset code.