Sign In:


  • Hide
    GALLERY: Hallowell Crane - Staff photo by Joe Phelan | of | Share this photo

    Leveling: Tom Goraj, left, and Al Hague hold levels as they check to see if the granite crane is standing straight on Wednesday in Hallowell.

    Show
  • Hide
    GALLERY: Hallowell Crane - Staff photo by Joe Phelan | of | Share this photo

    Success: Al Hague, second from left, raises his arms in celebration after the boom is attached to the crane along the Kennebec River on Wednesday in Hallowell.

    Show
  • Hide
    GALLERY: Hallowell Crane - Staff photo by Joe Phelan | of | Share this photo

    Teamwork: Al Hague holds a level as other workers tighten one of the guy wires that will hold up the crane as it is installed in the park on Wednesday in Hallowell.

    Show
  • Hide
    GALLERY: Hallowell Crane - Staff photo by Joe Phelan | of | Share this photo

    Pinned: Al Hague pounds in a pin that holds the boom onto the crane on Wednesday in Hallowell.

    Show
  • Hide
    GALLERY: Hallowell Crane - Staff photo by Joe Phelan | of | Share this photo

    Connection: Brian Monk, of Peachey Builders, left, guides the boom as it swings into place with a crane on Wednesday in Hallowell. Al Hague is standing by the crane waiting to attach the boom.

    Show