KITTERY — The north span of the new Memorial Bridge connecting New Hampshire and Maine is getting ready for its big entrance.
The span is expected to be floated in at about 1 a.m. Wednesday. Stephen DelGrosso of contractor Archer Western tells the Portsmouth Herald the tide and currents dictate that the float-in start early.
The move toward the Kittery side of the bridge would be completed by 8 a.m.
The barge Cape Cod – on which the north span is being built at the Port of New Hampshire – is expected to be moved through the Sarah Mildred Long Bridge on Tuesday afternoon, then be tied up on the downriver side awaiting the float-in.
The new Memorial Bridge connecting Portsmouth and Kittery is scheduled to open to traffic this summer.
Send questions/comments to the editors.
-
Letters to the Editor
Put solar arrays on big-box stores
-
Editorials
View from Away: How to improve the Affordable Care Act
-
Letters to the Editor
Collins right to follow conscience on Trump vote
-
Opinion
Today’s editorial cartoon
-
Letters to the Editor
Excited to vote for Hickman for Senate
Success. Please wait for the page to reload. If the page does not reload within 5 seconds, please refresh the page.
Enter your email and password to access comments.
Hi {SUB NAME}, to comment on stories you must . This profile is in addition to your subscription and website login.
Already have one? .
Invalid username/password.
Please check your email to confirm and complete your registration.
Only subscribers are eligible to post comments. Please subscribe or login to participate in the conversation. Here’s why.
Use the form below to reset your password. When you've submitted your account email, we will send an email with a reset code.